SCHEDULE OF COMPONENTS

1. CONVENTIONAL ABSORPTION BED
OR LEACHFIELD SYSTEM

2. PERIMETER BARRIER AND CAP
(30 mil PVC, HDPE OR NATURAL MATERIALS)

3. AIR PUMP
(GAST MODEL MOAP101AA)
(1/16 HP, 115 VAC OR EQUAL)

4. WELLPOINT
(2" DIA. C.S. OR PVC)

5. LEVEL CONTROL
ON-OFF-HIGH LEVEL
(WARRICK SERIES 16M OR EQUAL)

6. ATMOSPHERIC AIR EXCHANGE SYSTEM

Click for more detail