SCHEDULE OF COMPONENTS
1. CONVENTIONAL ABSORPTION BED OR LEACHFIELD SYSTEM
2. PERIMETER BARRIER AND CAP (30 mil PVC, HDPE OR NATURAL MATERIALS)
3. AIR PUMP (GAST MODEL MOAP101AA) (1/16 HP, 115 VAC OR EQUAL)
4. WELLPOINT (2" DIA. C.S. OR PVC)
5. LEVEL CONTROL ON-OFF-HIGH LEVEL (WARRICK SERIES 16M OR EQUAL)
6. ATMOSPHERIC AIR EXCHANGE SYSTEM |